Loading page content
Loading page content
Time required to build a warehouse (days) (Equatorial Guinea) was reported at 144 in January 2019. The reading was unchanged from the previous value of 144.
The January 2019 reading was unchanged from the previous value of 144. Historically, this indicator is positively correlated with EUR/USD (Watch) and positively correlated with XAU/USD (Watch).
Multi-horizon symbol forecasts, Rolling-Surprise economic predictions, and programmatic API access.
Expected Zones · Trade Bias · Confidence Intervals · API Access · 1,456+ instruments